Sunday 13 February 2011

Where's the bathroom gone

Iain popped in for a few hours on Tuesday and the bathroom disappeared...




O there's the bath

Colin and Jamie

These two guys repaired the roughcast and redid the cement finish below floor level. 

It looks a lot neater.


When the boys came with their invoice Colin told me Jamie was brought up in this house - so I had to invite them in to look round.

Jamie in his old room!
I'll let them come back when its finished.

Wednesday 9 February 2011

Dormers

After the repairs were made by Steve.... Paul and Mick refelted the dormers. I climbed the ladder to inspect the last one but I didn't take my camera. I needed both hands to hold on - its a long time since I was able to scamper up and down scaffolding!



Doesn't that look better!

Sunday 6 February 2011

Roofline

Steve came with his chum Tom and expected to fit shiny new white plastic roofline goods but.... what a lot of rot they found when they started stripping the old facias. Scaffolding was borrowed from Mick and timber fetched from Jewsons and repairs started. A 2-3 day job took about 6 days in all including nearly being blown off the scaffold by the high winds.


3 wasp nests were found in the dormers